Alex

26h 00min
PROJECT PLANNED TRACKED STATUS
Off-work: 1 May
Admin - Junta semanal 1h 00min 2h 12min
Goal
Enseñanza y aprendizaje - Enigma talk 0h 40min 0h 21min
Goal
Admin - Promoción / Difusión Update Sin Syllabus 3h 30min 0h 00min
Didn't happen
id-libelul-hotel - Dirección 0h 00min 0h 00min
No status
w3-nhg - Gestión admin Kick-off 1h 00min 0h 00min
Didn't happen
w3-nhg - Gestión interna Debrief 0h 30min 0h 00min
Didn't happen
w3-nhg - Estrategia 6h 00min 3h 19min
Goal
cu-califa-de-león - Gestión x producción posavasos 0h 30min 0h 26min
Goal
cu-casa-fernanda - Iconos | 2026 6h 00min 5h 36min
Goal
cu-ideabitat-rrss - Parrilla mayo Ajustes 7h 00min 0h 00min
Didn't happen
No laboral
Didn't happen
Admin - Oficina 0h 00min 1h 33min
Unplanned
Admin - Promoción / Difusión 0h 00min 4h 23min
Unplanned
cu-califa-de-león - Gestión interna 0h 00min 0h 08min
Unplanned
cu-casa-fernanda - 26 Trazo de íconos 0h 00min 1h 36min
Unplanned
cu-ideabitat-rrss - Gestión admin 0h 00min 0h 58min
Unplanned
cu-ideabitat-rrss - Parrilla mayo 0h 00min 1h 40min
Unplanned
w3-nhg - Gestión interna 0h 00min 2h 09min
Unplanned
w3-nhg - Gestión admin 0h 00min 1h 13min
Unplanned
TOTAL 26h 10min 25h 34min
Planned 26h 10min
Tracked 25h 34min
Capacity 26h 00min
Unplanned +13h 40min
Exceeded +1h 12min
WEEK 19 - NEW ASSIGNMENTS | 4 - 10 MAY
32h 30min
ASSIGNMENT DATES PLANNED HOURS DELIVERY DATES
Admin - Junta semanal 4 May 1h 00min
Enseñanza y aprendizaje - Enigma talk 4 - 8 May 0h 50min
cu-casa-fernanda - Gestión admin Proveedor 5 May 1h 00min
id-libelul-hotel - Dirección 4 - 8 May 0h 00min
w3-nhg - Superficie Fase 1 4 - 8 May 20h 00min
cu-casa-fernanda - Iconos | 2026 Keynote;Mockup 5 - 8 May 8h 00min
cu-ideabitat-rrss - Parrilla mayo Adaptaciones 4 May 2h 00min
TOTAL 32h 50min

Alfredo

26h 00min
PROJECT PLANNED TRACKED STATUS
Off-work: 1 May
Admin - Junta semanal 1h 00min 1h 53min
Goal
Enseñanza y aprendizaje - Enigma talk 0h 40min 0h 13min
Goal
Admin - Promoción / Difusión Visita Anáhuac 3h 00min 0h 00min
Didn't happen
cu-blas - Dirección 0h 00min 0h 00min
No status
cu-casa-fernanda - Dirección 0h 00min 0h 00min
No status
cu-ideabitat-rrss - Dirección 0h 00min 0h 00min
No status
cu-lil'-big - Gestión admin Rev. uniformes 1h 00min 0h 00min
Didn't happen
w3-nhg - Gestión admin Kick-off 1h 00min 0h 00min
Didn't happen
w3-nhg - Gestión interna Debrief 0h 30min 0h 00min
Didn't happen
cu-califa-de-león - Formulario vacantes programación Implementación 4h 00min 0h 00min
Didn't happen
w3-nhg - Estrategia 6h 00min 5h 58min
Goal
portafolio-enigma (tp-emperador) - Diseño gráfico 10h 00min 9h 39min
On going
No laboral
Didn't happen
Admin - Oficina 0h 00min 1h 25min
Unplanned
Admin - Promoción / Difusión 0h 00min 2h 30min
Unplanned
Admin - Gestión interna 0h 00min 0h 46min
Unplanned
cu-lil'-big - Gestión admin 0h 00min 1h 19min
Unplanned
w3-nhg - Gestión interna 0h 00min 0h 13min
Unplanned
w3-nhg - Gestión admin 0h 00min 0h 49min
Unplanned
TOTAL 27h 10min 24h 45min
Planned 27h 10min
Tracked 24h 45min
Capacity 26h 00min
Unplanned +7h 02min
Exceeded +0h 53min
WEEK 19 - NEW ASSIGNMENTS | 4 - 10 MAY
26h 00min
ASSIGNMENT DATES PLANNED HOURS DELIVERY DATES
Enseñanza y aprendizaje - Enigma talk 5 - 8 May 0h 40min
cu-blas - Dirección 5 - 8 May 0h 00min
cu-casa-fernanda - Gestión admin Proveedor 5 May 1h 00min
cu-casa-fernanda - Dirección 5 - 8 May 0h 00min
cu-ideabitat-rrss - Dirección 5 - 8 May 0h 00min
Mejora de proyectos - Dirección Figma IESP 5 - 8 May 2h 00min
cu-califa-de-león - Formulario vacantes programación Implementación 5 - 8 May 6h 00min
w3-nhg - Superficie Fase 1 5 - 12 May 23h 00min
cu-brand-lúminos - Asesorías mayo 8 May 1h 00min
cu-califa-de-león - Menú Validación de preprensa 6 May 1h 00min
No laboral - Vacaciones 4 May
TOTAL 34h 40min

Ari

26h 00min
PROJECT PLANNED TRACKED STATUS
Off-work: 1 May
Admin - Junta semanal 1h 00min 1h 49min
Goal
Admin - Legal 1h 00min 1h 37min
Goal
Admin - Nóminas 1h 00min 0h 27min
Goal
Enseñanza y aprendizaje - Enigma talk 0h 40min 0h 14min
Goal
Admin 8h 40min 13h 35min
Goal
Admin - Promoción / Difusión Visita Anáhuac 3h 00min 0h 00min
Didn't happen
Admin - gestión 0h 00min 7h 38min
Goal
cu-blas - Gestión admin 0h 00min 0h 00min
No status
cu-blas - Gestión interna 0h 00min 0h 04min
Goal
cu-brand-lúminos - Gestión admin 0h 00min 0h 00min
No status
cu-califa-de-león - Gestión admin 0h 00min 0h 10min
Goal
cu-califa-de-león - Gestión interna 0h 00min 0h 13min
Goal
cu-casa-fernanda - Gestión admin 0h 00min 0h 02min
Goal
cu-hablemos 2026 - Gestión admin 0h 00min 0h 00min
No status
cu-ideabitat-rrss - Gestión admin 0h 00min 0h 00min
No status
cu-lil'-big - Gestión admin 0h 00min 0h 00min
No status
cu-lil'-big - Gestión interna 0h 00min 0h 18min
Goal
id-acorde - Gestión admin 0h 00min 0h 00min
No status
id-libelul-hotel - Gestión admin 0h 00min 0h 00min
No status
id-mg-logistics - Gestión admin 0h 00min 0h 00min
No status
w3-galería-lazcarro - Gestión admin 0h 00min 0h 00min
No status
w3-glyphs - Gestión admin 0h 00min 0h 00min
No status
w3-glyphs - Gestión interna 0h 00min 0h 07min
Goal
w3-nhg - Gestión admin 0h 00min 0h 10min
Goal
w3-TdL - Gestión 0h 00min 0h 00min
No status
Mejora de proyectos - Impulso de técnicas y procesos internos 0h 00min 0h 48min
Proactive
No laboral
Didn't happen
cu-califa-de-león - Gestión x producción posavasos 0h 00min 0h 28min
Unplanned
Proyectos pasados 0h 00min 1h 37min
Unplanned
w3-califa-de-león - FED 0h 00min 0h 21min
Unplanned
w3-nhg - Others 0h 00min 0h 04min
Unplanned
TOTAL 15h 20min 29h 42min
Planned 15h 20min
Tracked 29h 42min
Capacity 26h 00min
Unplanned +2h 30min
Exceeded +15h 03min
Proactive 🚀 0h 48min
WEEK 19 - NEW ASSIGNMENTS | 4 - 10 MAY
32h 30min
ASSIGNMENT DATES PLANNED HOURS DELIVERY DATES
Admin - Junta semanal 4 May 1h 00min
Admin - Legal 7 May 1h 00min
Enseñanza y aprendizaje - Enigma talk 4 - 8 May 0h 50min
Admin 4 - 8 May 10h 00min
Admin - gestión 4 - 8 May 6h 15min
Admin - Contabilidad 5 - 6 May 2h 00min
cu-blas - Gestión admin 4 - 8 May 0h 00min
cu-brand-lúminos - Gestión admin 4 - 8 May 0h 00min
cu-califa-de-león - Gestión admin 4 - 8 May 0h 00min
cu-hablemos 2026 - Gestión admin 4 - 8 May 0h 00min
cu-ideabitat-rrss - Gestión admin 4 - 8 May 0h 00min
cu-lil'-big - Gestión admin 4 - 8 May 0h 00min
id-acorde - Gestión admin 4 - 8 May 0h 00min
id-libelul-hotel - Gestión admin 4 - 8 May 0h 00min
id-mg-logistics - Gestión admin 4 - 8 May 0h 00min
w3-galería-lazcarro - Gestión admin 4 - 8 May 0h 00min
w3-glyphs - Gestión admin 4 - 8 May 0h 00min
w3-nhg - Gestión admin 4 - 8 May 0h 00min
w3-TdL - Gestión 4 - 8 May 0h 00min
TOTAL 21h 05min

chloe

26h 00min
PROJECT PLANNED TRACKED STATUS
Off-work: 1 May
Admin - Junta semanal 1h 00min 1h 50min
Goal
Enseñanza y aprendizaje - Enigma talk 0h 40min 0h 20min
Goal
Admin - Promoción / Difusión Visita Anáhuac 3h 00min 0h 00min
Didn't happen
w3-glyphs - Gestión admin 1h 00min 1h 31min
Goal
w3-glyphs - Gestión interna 0h 00min 0h 11min
Goal
w3-glyphs - Handbook single 4h 00min 0h 00min
Didn't happen
w3-glyphs - Tools single | móvil 0h 00min 2h 07min
Goal
w3-glyphs - Buy | móvil 0h 00min 1h 00min
Goal
w3-glyphs - Handbook single | móvil 0h 00min 0h 24min
Goal
cu-blas - Restauro | Señalización Preprensa 2h 00min 0h 00min
Didn't happen
portafolio-enigma (tp-flamin-hot) - Diseño gráfico 7h 00min 5h 31min
On going
cu-califa-de-león - Menú Preprensa 2h 00min 0h 00min
Didn't happen
Practicante - Ideabitat | Parrilla abril 0h 00min 0h 35min
Review
No laboral
Didn't happen
portafolio-enigma (tp-flamin-hot) - Ajustes y correcciones 3h 00min 0h 00min
Didn't happen
portafolio-enigma (tp-flamin-hot) - Exports 2h 00min 0h 00min
Didn't happen
portafolio-enigma (tp-flamin-hot) - Liberar 1h 00min 0h 00min
Didn't happen
Admin - Oficina 0h 00min 1h 29min
Unplanned
Admin - Promoción / Difusión 0h 00min 5h 26min
Unplanned
Admin - Dirección Practicante 0h 00min 1h 05min
Unplanned
Admin - Autogestión 0h 00min 0h 11min
Unplanned
cu-blas - Restauro | Señalización 0h 00min 3h 10min
Unplanned
cu-califa-de-león - Menú 0h 00min 2h 00min
Unplanned
Enseñanza y aprendizaje - Software 0h 00min 1h 00min
Unplanned
TOTAL 26h 40min 27h 50min
Planned 26h 40min
Tracked 27h 50min
Capacity 26h 00min
Unplanned +14h 21min
Exceeded +5h 03min
WEEK 19 - NEW ASSIGNMENTS | 4 - 10 MAY
19h 30min
ASSIGNMENT DATES PLANNED HOURS DELIVERY DATES
Admin - Junta semanal 4 May 2h 00min
Enseñanza y aprendizaje - Enigma talk 4 - 6 May 0h 30min
w3-glyphs - Newsletter Dark Mode;Mobile;Desktop 4 - 6 May 4h 00min
cu-blas - Restauro | Señalización Ajustes 4 - 5 May 4h 00min
portafolio-enigma (tp-flamin-hot) - Diseño gráfico 5 May 4h 00min
cu-califa-de-león - Menú Ajustes;Preprensa 4 May 2h 00min
No laboral - Vacaciones 7 - 8 May
portafolio-enigma (tp-flamin-hot) - Ajustes y correcciones 6 May 3h 00min
portafolio-enigma (tp-flamin-hot) - Exports 6 May 2h 00min
portafolio-enigma (tp-flamin-hot) - Liberar 6 May 1h 00min
TOTAL 22h 30min

Fer Olea

26h 00min
PROJECT PLANNED TRACKED STATUS
Off-work: 1 May
Admin - Junta semanal 1h 00min 1h 55min
Goal
Enseñanza y aprendizaje - Enigma talk 0h 40min 0h 20min
Goal
Admin - Promoción / Difusión Visita Anáhuac 3h 00min 0h 00min
Didn't happen
cu-ideabitat-rrss - Gestión admin 0h 00min 0h 51min
Goal
id-mg-logistics - Dirección 0h 00min 0h 00min
No status
portafolio-enigma (id+w3+tp-califa) - Diseño gráfico 10h 00min 3h 22min
Incomplete
cu-blas - Restauro | Señalización Validación de preprensa 2h 00min 0h 00min
Didn't happen
portafolio-enigma (tp-flamin-hot) - Diseño gráfico 3h 00min 4h 20min
Goal
cu-califa-de-león - Menú Validación de preprensa 2h 00min 0h 00min
Didn't happen
cu-califa-de-león - Intervención espacios 0h 00min 0h 00min
No status
cu-ideabitat-rrss - Parrilla mayo Ajustes 6h 00min 0h 00min
Didn't happen
No laboral
Didn't happen
Admin - Oficina 0h 00min 3h 25min
Unplanned
Admin - Promoción / Difusión 0h 00min 4h 26min
Unplanned
Admin - Autogestión 0h 00min 0h 10min
Unplanned
cu-blas - Restauro | Señalización 0h 00min 0h 44min
Unplanned
cu-califa-de-león - Menú 0h 00min 1h 07min
Unplanned
cu-ideabitat-rrss - Parrilla mayo 0h 00min 3h 45min
Unplanned
TOTAL 27h 40min 24h 25min
Planned 27h 40min
Tracked 24h 25min
Capacity 26h 00min
Unplanned +13h 37min
Exceeded +3h 06min
WEEK 19 - NEW ASSIGNMENTS | 4 - 10 MAY
32h 30min
ASSIGNMENT DATES PLANNED HOURS DELIVERY DATES
Admin - Junta semanal 4 May 1h 00min
Enseñanza y aprendizaje - Enigma talk 4 - 8 May 0h 50min
portafolio-enigma (id+w3+tp-califa) - Diseño gráfico 6 - 8 May 10h 00min
w3-nhg - Superficie Fase 1 5 - 8 May 6h 00min
cu-blas - Restauro | Señalización Validación de preprensa 5 May 1h 00min
cu-brand-lúminos - Señalización 5 - 8 May 6h 00min
cu-califa-de-león - Posteos Post 4 May 3h 00min
cu-ideabitat-rrss - Parrilla mayo Adaptaciones 4 May 2h 00min
Mejora de proyectos - Figma IESP Figma IESP 5 - 8 May 6h 00min
TOTAL 35h 50min

Isaías

26h 00min
PROJECT PLANNED TRACKED STATUS
Off-work: 1 May
Admin - Junta semanal 1h 00min 2h 00min
Goal
Admin - Nóminas 1h 00min 0h 00min
Didn't happen
Admin - Legal 1h 00min 1h 15min
Goal
Enseñanza y aprendizaje - Enigma talk 0h 40min 0h 35min
Goal
Admin 8h 40min 16h 55min
Goal
Admin - Promoción / Difusión Visita Anáhuac 3h 00min 0h 00min
Didn't happen
portafolio-enigma (tp-flamin-hot) - Dirección Revisión interna 1h 00min 0h 00min
Didn't happen
w3-glyphs - Gestión admin 1h 00min 2h 15min
Goal
w3-TdL - Ajustes 3h 00min 0h 00min
Didn't happen
cu-blas - Restauro | Señalización Revisión 1 1h 00min 0h 00min
Didn't happen
cu-blas - Caligrafía 6h 00min 2h 20min
On going
cu-califa-de-león - Menú Revisión 1 1h 30min 0h 00min
Didn't happen
No laboral
Didn't happen
cu-blas - Restauro | Señalización 0h 00min 0h 25min
Unplanned
cu-califa-de-león - Gestión x producción menú 0h 00min 1h 32min
Unplanned
tp-lil'-big - Desarrollo tipográfico 0h 00min 2h 33min
Unplanned
TOTAL 28h 50min 29h 50min
Planned 28h 50min
Tracked 29h 50min
Capacity 26h 00min
Unplanned +4h 30min
Exceeded +10h 45min
WEEK 19 - NEW ASSIGNMENTS | 4 - 10 MAY
15h 30min
ASSIGNMENT DATES PLANNED HOURS DELIVERY DATES
Admin - Legal 7 May 1h 00min
Enseñanza y aprendizaje - Enigma talk 6 - 8 May 0h 30min
Admin 6 - 8 May 6h 00min
admin-TdL - Admin 6 - 8 May 0h 30min
id-tesoros-de-mexico - Dirección 6 - 8 May 0h 00min
portafolio-enigma (tp-flamin-hot) - Dirección Revisión interna 6 May 1h 00min
cu-blas - Caligrafía 6 - 7 May 9h 00min
No laboral - Vacaciones 4 - 5 May
No laboral - Off 8 May
TOTAL 18h 00min

Jaime Martínez

26h 00min
PROJECT PLANNED TRACKED STATUS
Off-work: 1 May
Admin - Junta semanal 1h 00min 1h 45min
Goal
Admin - Legal 1h 00min 1h 20min
Goal
Admin - Nóminas Nóminas 1h 00min 0h 00min
Didn't happen
Enseñanza y aprendizaje - Enigma talk 0h 40min 0h 20min
Goal
Admin 8h 40min 12h 25min
Goal
Admin - Promoción / Difusión Visita Anáhuac 3h 00min 0h 00min
Didn't happen
ap-la-noria - Dirección 0h 00min 0h 00min
No status
cu-brand-lúminos - Dirección 0h 00min 0h 00min
No status
cu-califa-de-león - Dirección 0h 00min 0h 00min
No status
cu-hablemos 2026 - Dirección 0h 00min 0h 00min
No status
cu-lil'-big - Gestión admin Pres. landing 1h 00min 0h 00min
Didn't happen
cu-lil'-big - Dirección 0h 00min 0h 00min
No status
cu-occ 2026 - Dirección 0h 00min 0h 00min
No status
w3-glyphs - Dirección 0h 00min 0h 00min
No status
w3-nhg - Gestión admin Kick-off 1h 00min 0h 00min
Didn't happen
w3-nhg - Gestión interna Debrief 0h 30min 0h 00min
Didn't happen
w3-nhg - Dirección 0h 00min 0h 00min
No status
w3-nhg - Estrategia 1h 00min 0h 00min
Didn't happen
cu-brand-lúminos - Asesorías abril 1h 30min 0h 40min
On going
cu-brand-lúminos - Lectura de documentos 1h 00min 0h 00min
Didn't happen
id-mg-logistics - Naming 4h 00min 0h 00min
Blocked
cu-lil'-big - Liberar 1h 00min 0h 00min
Blocked
No laboral
Didn't happen
Admin - Nóminas 0h 00min 1h 00min
Unplanned
cu-lil'-big - Gestión admin 0h 00min 1h 30min
Unplanned
cu-lil'-big - Landing page programación 0h 00min 1h 30min
Unplanned
w3-nhg - Programación 0h 00min 5h 30min
Unplanned
w3-nhg - BED + dinamización 0h 00min 1h 30min
Unplanned
TOTAL 26h 20min 27h 30min
Planned 26h 20min
Tracked 27h 30min
Capacity 26h 00min
Unplanned +11h 00min
Exceeded +4h 50min
WEEK 19 - NEW ASSIGNMENTS | 4 - 10 MAY
32h 30min
ASSIGNMENT DATES PLANNED HOURS DELIVERY DATES
Admin - Junta semanal 4 May 1h 00min
Admin - Legal 8 May 1h 00min
Enseñanza y aprendizaje - Enigma talk 4 - 8 May 0h 50min
Admin - Tecnologías de información 4 - 8 May 6h 00min
w3-nhg - Dirección 4 - 8 May 0h 00min
w3-nhg - BED + dinamización 4 - 6 May 6h 00min
id-mg-logistics - Keynote naming 7 - 8 May 4h 00min
id-mg-logistics - Naming 7 May 2h 00min
cu-califa-de-león - Menú Revisión 1 5 May 1h 00min
cu-lil'-big - Uniformes 7 - 8 May 0h 00min
TOTAL 21h 50min

Xaret

26h 00min
PROJECT PLANNED TRACKED STATUS
Off-work: 1 May
Admin - Junta semanal 1h 00min 1h 52min
Goal
Enseñanza y aprendizaje - Enigma talk 0h 40min 0h 14min
Goal
Practicante - Ideabitat | Parrilla mayo Ajustes;Cantollano 6h 00min 0h 00min
Didn't happen
Practicante - Ideabitat | Parrilla abril Ajustes 3h 00min 0h 00min
Goal
Practicante - Ideabitat | Parrilla abril 0h 00min 4h 44min
Goal
No laboral
Didn't happen
Practicante - Califa | Manual técnico 15h 00min 0h 00min
Goal
Practicante - Ideabitat - Gestión admin 0h 00min 0h 47min
Goal
Practicante - El Califa de León | Manual técnico 0h 00min 10h 09min
Incomplete
Admin - Oficina 0h 00min 2h 04min
Unplanned
Practicante - Enigma - Others 0h 00min 1h 07min
Unplanned
Practicante - Ideabitat | Parrilla mayo 0h 00min 3h 00min
Unplanned
TOTAL 25h 40min 23h 57min
Planned 25h 40min
Tracked 23h 57min
Capacity 26h 00min
Unplanned +6h 11min
Exceeded +16h 32min
WEEK 19 - NEW ASSIGNMENTS | 4 - 10 MAY
32h 30min
ASSIGNMENT DATES PLANNED HOURS DELIVERY DATES
Admin - Junta semanal 4 May 1h 00min
Enseñanza y aprendizaje - Enigma talk 4 - 8 May 0h 50min
Practicante - Formulario vacantes superficie Móvil 5 - 8 May 6h 00min
Practicante - Califa | Manual técnico 4 - 8 May 25h 00min
TOTAL 32h 50min

GENERAL LOAD W19

TEAM MEMBER AVAILABLE HOURS ASSIGNED HOURS
Alex 32h 30min 32h 50min
Alfredo 26h 00min 34h 40min
Ari 32h 30min 21h 05min
chloe 19h 30min 22h 30min
Fer Olea 32h 30min 35h 50min
Isaías 15h 30min 18h 00min
Jaime Martínez 32h 30min 21h 50min
Xaret 32h 30min 32h 50min
TOTAL 223h 30min 219h 35min